Day 1: Remove old driveway.
Day 2: Remove the second (surprise!) driveway; pour the new stamped brick patio. Here Scott is trying to find where the cement runner ends.
Day 3: Pour the new driveway. We plan to park side-by-side, and hopefully both be free to leave without moving a car. We will put in some stepping stones and little lamps connecting the driveway to the back yard.
Many of the flowers are dying as the weather turns cold. The dahlias are thriving!
No comments:
Post a Comment